The Preventive Maintenance Calendar

Daily to annual checks across every machine in the plant - scheduled, logged and costed, so breakdowns stay theoretical.

Every plant runs one of two maintenance systems. The first reacts: machines run until something breaks, then everyone scrambles for parts while orders wait. The second schedules: small services happen on a calendar, wear parts are replaced before they fail, and breakdowns become rare events the team barely remembers. The equipment is identical - the calendar is the difference.

This guide is that calendar, written out for every machine in a typical plant. It unifies the machine-specific routines from our blow and injection guides, the mould care schedule and the RO plant into one plan - with the staffing model from our shifts guide deciding who owns each list.

The Math

Two Hours a Week vs Days of Downtime

Count a typical plant's PM load: 10-15 minutes daily per machine at shift start, 30-60 minutes weekly per system, a few hours quarterly, one focused annual day. Total: roughly two to four hours a week. Now count one unscheduled breakdown: the stopped production, the emergency freight on a part, the crew standing idle, the delivery promise broken. Most plants find that a single avoided breakdown pays for a full year of PM time. Maintenance is not a cost against production - it is production, insured.

Rule of the trade: you will pay for maintenance either way - in scheduled hours or in breakdown days. One of them is cheaper by an order of magnitude.
The Calendar

Daily & Weekly: The Operator's Lists

DA

Daily - Every Shift Start

Hydraulic oil level, air pressure at regulator, mould water flow and temperature, heater zones at setpoint, first-shot weight logged. 10-15 minutes per machine, per the shift discipline.

DA

Daily - Every Shift End

Five-unit weight check, last part vs golden sample, leaks walked and noted, log entry completed. No log, no handover.

WK

Weekly - Machine Side

Clean die lips and vents, check filter screens and hydraulic filters, inspect belts and chains, verify safety interlocks, blow dust from electrical cabinets.

WK

Weekly - Water & Air Side

Compressor oil level and belt tension, dryer condition, chiller temperature check, RO pre-filter pressure readings, drain traps tested - per the utility guide.

The Calendar

Monthly, Quarterly & Annual: The Deeper Services

MO

Monthly

Full machine wipe-down and inspection, hydraulic oil sample if hours are high, cooling flow rates logged against baseline (a falling rate is scale announcing itself, per the mould guide), filler nozzle and gripper inspection, safety equipment tested.

Q1

Quarterly

Cooling channel descaling flush, gearbox oil top-up or change per hours, valve and seal inspection across the air system, mould strip-down deep clean per the mould schedule, QC instruments calibration check per the QC guide.

AN

Annually

The full service day: complete machine inspection with worn-part replacement, screw and barrel condition check, hydraulic system service, RO membrane performance test, compressor overhaul assessment, and the preventive parts order for the year ahead - informed by twelve months of logged failures, per the spares checklist.

LO

The PM Log Feeds Everything

Every completed check goes in the production log - the warranty compliance record per the warranty guide, the defect-prevention history, and the data that writes next year's parts list.

The Ownership

Who Owns Each List

OP

Lead Operator: Daily

The shift-start and shift-end lists - nobody knows the machine's normal better than the person running it.

SP

Supervisor: Weekly

The weekly machine and utility lists, verified and signed. The supervisor also guards the maintenance window between shifts.

TE

Technician or Us: Quarterly & Annual

Deeper services need tools and training - your technician, or the annual service visits arranged through our service desk.

OW

The Owner: Reviews the Log

Weekly log review is an owner habit - the trends in it are the earliest warnings, and they fund the spares order.

Avoid

Four PM Mistakes That Cancel the Calendar

01

The Calendar That Lives in a Drawer

A PM plan nobody sees is a plan nobody runs. Print the lists, pin them at each machine, tick them in ink.

02

PM Sacrificed to Rush Orders

The busy week is when the pump was about to fail anyway. Protect the maintenance window - the calendar only works if it survives production pressure.

03

PM Without Parts

Opening a machine for service and finding no seal on the shelf turns scheduled hours into stopped days - the spares kit and the calendar are one system.

04

Logging Only the Failures

Completed PM checks are as valuable to log as breakdowns - they prove warranty compliance and show the wear patterns that plan next year.

Our standing offer: every Goluwa machine ships with its PM schedule documented to your serial number, and annual service visits are arranged through our service desk. Send your machine list - we return a consolidated plant-wide calendar, within 24 hours.
FAQ

Preventive Maintenance - Questions Answered

What is preventive maintenance and why does it matter?

Preventive maintenance (PM) is servicing equipment on a schedule before it fails, instead of after. Plants that run PM see fewer breakdowns, longer machine life, steadier quality and lower spare parts costs - because failures are caught as wear, not as stoppages.

How much time does preventive maintenance take?

The daily routine is 10-15 minutes per machine at shift start. Weekly and monthly tasks run 30-60 minutes each, scheduled between production runs. A full plant invests roughly 2-4 hours a week in PM - versus days of downtime when the same issues surface as breakdowns.

Who should do the preventive maintenance?

The lead operator handles daily checks; the supervisor owns the weekly list; a trained technician (or annual service visits arranged with us) covers quarterly and annual work. PM is a shared habit, not one person's job - per the cross-training rule in our staffing guide.

What happens if preventive maintenance is skipped?

The failure chain is predictable: skipped oil checks become seized pumps, missed filter changes become contaminated product, ignored scale becomes 20 percent longer cycles, and a skipped annual service becomes a breakdown at peak season. PM skipped is breakdowns scheduled.

Does preventive maintenance affect my warranty?

Yes - skipped scheduled maintenance is the most common warranty void, per our warranty guide. The PM calendar in this guide doubles as the compliance record that keeps your coverage intact.

Want Your Plant-Wide PM Calendar?

Send your machine list - we consolidate every schedule into one plant-wide calendar with owners, checklists and the parts list, within 24 hours.

Get My PM Calendar → Read: Troubleshooting Guide